ARCHITECT NAME Oxford Architecture  
  ARCHITECT ADDRESS 209 10th Ave. South   suite# 320  
    Nashville TN 37203  
  City State Zip  
  PROJECT NAME: Tuffy  
  PROJECT ADDRESS 1 Fairview  
    Greer SC 29650  
  City State Zip  
 
  PAGE DESCRIPTION DATE DELTA # AND DATE DELTA # AND DATE DELTA # AND DATE DELTA # AND DATE  
  Civils Drawings            
  CV-1 STAKEOUT PLAN Received 09/10/07   Created (08/13/07) #1Received 10/12/07   Created (10/03/07)        
  CV-2 GRADING,DRAINAGE, & EROSION PLAN Received 09/10/07   Created (08/13/07) #1Received 10/12/07   Created (10/03/07)        
  CV-3 UTILITY PLAN Received 09/10/07   Created (08/13/07) #1Received 10/12/07   Created (10/03/07)        
  CV-4 DETAILS Received 09/10/07   Created (08/13/07) #1Received 10/12/07   Created (10/03/07)        
  CV-5 DETAILS Received 09/10/07   Created (08/13/07) #1Received 10/12/07   Created (10/03/07)        
  D-1 DEMOLITION PLAN #1Received 10/12/07   Created (10/03/07) Received 09/10/07   Created (08/13/07)        
                 
  Architectural Drawings            
  COVER COVER SHEET Received 09/19/07   Created (09/07/07)          
  AS-1 SITE REFERENCE PLAN Received 09/19/07   Created (09/07/07)          
  A-0 NOTES AND SCHEDULES Received 09/19/07   Created (09/07/07)          
  A-1 ARCHITECTURAL FLOOR PLAN Received 09/19/07   Created (09/07/07)          
  A-2 EXTERIOR ELEVATIONS Received 09/19/07   Created (09/07/07)          
  A-3 REFLECTED CEILING PLAN Received 09/19/07   Created (09/07/07)          
  A-4 WALL SECTIONS Received 09/19/07   Created (09/07/07)          
  A-5 INTERIOR ELEVATIONS AND DETAILS Received 09/19/07   Created (09/07/07)          
  A-6 PROJECT SPECIFICATIONS Received 09/19/07   Created (09/07/07)          
  A-7 DETAILS AND ELEVATIONS Received 09/19/07   Created (09/07/07)          
  S-1 FOUNDATION PLAN Received 09/19/07   Created (09/07/07)          
  S-2 SECTIONS AND DETAILS Received 09/19/07   Created (09/07/07)          
  S-3 GENERAL NOTES Received 09/19/07   Created (09/07/07)          
  MO-1 H.V.A.C. FLOOR PLAN Received 09/19/07   Created (09/07/07)          
  PO-1 PLUMBING PLAN Received 09/19/07   Created (09/07/07)          
  EO-1 ELECTRICAL FLOOR PLAN & SCHEDULES Received 09/19/07   Created (09/07/07)          
     
  Specification Book    
  Book Title DESCRIPTION DATE  
  SOIL REPORT REPORT OF SEISMIC REFRACTION SURVEY Received 09/19/07   Created (08/15/07)  
  SOIL TESTS GEOTECHNIACL EXPLORATION Received 09/19/07   Created (08/07/07)  
 
 
  < Back